Testing_122 : Defect Life Cycle

Defect or Bug Life Cycle :
  • As soon as the Test Engineer identifies the defect in Application...
  • Test Engineer has to report defect using BugZilla (or Track+).
  • By selecting Status, Severity, Found in Version/Build and providing Steps To Reproduce.
  • If it requires adding attachments, attach screenshots or necessary information regarding defect.
  • Test Engineer will report the defect to Test Lead / Dev Lead.
  • At the time of reporting, the defect status is called NEW.
  • Then Test Lead/Dev Lead check the defect and if it legit he change the status to OPEN.
  • Once the defect OPEN the developer will fix the defect.
  • Test Engineer will be notified of FIXED defects which can be RETESTED against new build.
  • If defect is FIXED, perform Retest and change the status to FIX VERIFIED.
  • Finally the Test Lead will verify once again and he will CLOSE the defect.
 Bug Life Cycle Participants :


Now understand the defect status hierarchy :
This is all possible situation would happens with defect...